The Chiller Consultant TMReal Time Cooling System Efficiency Monitor |
Case studies have shown that inefficient steam distribution and use can lead to exorbitant chiller load and in turn actually increase boiler load; one feeding the other. If your facility operates both heating and cooling systems simultaneously A thorough plant wide Thermal Utilization Survey will identify steam demand required to meet the heating needs and chiller capacity required to meet cooling needs without one driving the other. "The Chiller ConsultantTM" may be incorporated into "The Boiler ConsultantTM" software package as one integral package or stand on its own.
"The Chiller ConsultantTM" continuously calculates, displays, records and trends KW/ Ton at each stage of the delivery process (in accordance with ARI 550/590) and compares current performance to optimum performance of each sub-system along with combined performance depending on which combination of systems are being used.
"The Chiller ConsultantTM" continuously monitors your complete cooling system efficiency :
The information provided by "The Chiller ConsultantTM" enables you to:
What "The Chiller ConsultantTM" needs to know to create a "real time" window into your cooling process:
Cooling Tower | Chiller | Primary Loop | Secondary Loop | Tertiary Loop |
Make-up H 2O Temp. |
KW Input |
KW Input |
KW Input |
KW Input |
Make-up H2O Flow |
Supply H2O Temp. |
Supply H2O Temp. |
Supply H2O Temp. |
Supply H2O Temp. |
Make-up H2O TDS |
Supply H2O Flow |
Supply H2O Flow |
Supply H2O Flow |
Supply H2O Flow |
Basin TDS |
Return H2O Temp. |
Return H2O Temp. |
Return H2O Temp. |
Return H2O Temp. |
Relative Humidity |
Make-Up H2O Temp. |
Make-Up H2O Temp. |
Make-Up H2O Temp. |
Make-Up H2O Temp. |
Outdoor Air Temp. |
Make-Up H2O Flow |
|